Home/Services/Bathroom Installations
Luxury bathroom vanity with twin round basins, matt-black brassware and marble effect wall — full bathroom installation by Premier Heating
Bathroom Installations

Bathroom Design
& Installation
in Watford

Full bathroom, en-suite and wet room installations — designed, plumbed, tiled and finished by one small team. One point of contact, one quality standard, one written guarantee.

Gas Safe 212325 4.9★ · 156 Google reviews No call-out fee
38+ yrs
Plumbing experience
1
Point of contact
£5m
Public liability
12 mo
Workmanship guarantee
4.9★
156 Google reviews

What bathroom installations actually covers

What it is

A full bathroom installation from strip-out to final silicone: design and layout advice, all first-fix plumbing and pipework alterations, wall and floor tiling, waterproofing, sanitaryware and brassware installation, lighting connections and second-fix — all managed by us.

Who it's for

Homeowners tired of a dated bathroom, families needing an extra en-suite, landlords upgrading properties between tenancies, and clients converting a loft or extension. Whether it's a straight refit in the same footprint or a complete redesign, we handle both.

When you need it

When your existing bathroom is dated, leaking, poorly laid out or eating into your home's value. Bathrooms are the second-highest ROI improvement after kitchens — a well-fitted one is a real asset when you come to sell.

Why professional help matters

Most bathroom problems start with plumbing under the surface — bad falls on waste pipes, undersized supplies, poor waterproofing behind tiles. Because we're plumbers first and finishers second, the parts you don't see are done to a standard that lasts.

The cost of leaving it

The gap between a bathroom that lasts 20 years and one that starts failing at year three is almost entirely down to what happens before the tiles go on.

What can go wrong

  • Poorly tanked wet zones behind tiles cause hidden leaks that rot joists and destroy ceilings below — often only discovered years later.
  • Cheap or wrongly-specified waste falls back up into the shower tray or under the bath, creating slow drains and smells that never really go away.
  • Sub-standard first-fix pipework (undersized, unclipped, poor jointing) is impossible to fix later without ripping tiles off.
  • Multiple trades with no single point of accountability means every defect becomes 'the other trade's fault'.

Common mistakes we see

  • Choosing the cheapest fitter and hoping for the best — bathroom rework is one of the most expensive things to redo.
  • Buying sanitaryware and tiles yourself from the cheapest supplier without checking availability and lead times — projects grind to a halt waiting for backordered items.
  • Skipping proper wetroom tanking or a bonded waterproof membrane to save £150 on materials.
  • Not planning lighting and ventilation before first-fix — retrofitting them means chasing walls that have already been re-plastered.

Our process

A clear, repeatable system — the same on every job, whether you're a homeowner or a landlord with a portfolio.

  1. 01

    Design & survey visit

    We visit, take measurements, talk through layout, discuss sanitaryware options, budget and lead times, and identify what's realistic in the space.

  2. 02

    Fixed written quote

    Itemised — strip-out, first-fix plumbing, tiling, waterproofing, sanitaryware, brassware, electrics coordination and finishing. No open-ended day rates.

  3. 03

    Strip-out & first fix

    Old bathroom carefully removed, floors protected, waste and supply pipework moved to suit the new layout, electrics roughed in, walls patched and prepped.

  4. 04

    Waterproofing & tiling

    Wet zones properly tanked, floors self-levelled where needed, tiling to your chosen pattern with straight, consistent grout lines. No shortcuts behind the walls.

  5. 05

    Second fix & handover

    Sanitaryware and brassware fitted, silicone finished, everything tested, room cleaned. You get a full walk-through and a written 12-month workmanship guarantee.

What you get

One team, one guarantee

No juggling separate plumbers, tilers and electricians. One quote, one project manager, one warranty on the whole job.

Plumbing done properly

First-fix pipework sized, clipped and pressure-tested before anything gets covered up. What's behind the wall lasts as long as what's on it.

Wet zones tanked correctly

Full bonded waterproof membrane on floors and wet walls — not just a coat of paint-on tanking under the tiles.

Real design input

Practical suggestions on layout, storage, lighting and ventilation from someone who's fitted hundreds of bathrooms, not read three catalogues.

Trusted supplier network

We can source sanitaryware, brassware, tiles and lighting at trade prices — or fit customer-supplied items you've chosen yourself.

12-month workmanship guarantee

Full written guarantee on the whole installation, on top of any manufacturer warranties.

Recent bathroom installations work

Photos from real jobs completed by Matt and the Premier Heating team.

Marble effect bathroom with freestanding stone bath and wall-mounted lightingFully tiled marble effect bathroom with built-in bath and recessed nicheBacklit vanity unit with twin basins and mirrored cabinets in a luxury bathroomMarble effect walk-in shower with ceiling-mounted rain head and glass screenTwin basin vanity with backlit mirror in a fully tiled luxury bathroomRound stone basin and back-to-wall WC in a marble effect bathroom suiteLarge-format marble effect tiling being installed on a bathroom wallConcealed wall-hung WC frame set to laser levels during a bathroom rough-in

In detail

We handle full bathroom refits, en-suites, wet rooms, downstairs cloakrooms and cylinder-and-bathroom package upgrades. What we're really selling is a bathroom that still looks and performs like new in 15 years.

First-fix plumbing is everything

Almost every bathroom problem we're called back to fix (weeping showers, slow drains, whistling taps, low flow) traces back to first-fix work someone rushed. We take our time on this stage — supplies correctly sized to shower demand, waste runs at proper falls, isolators on every appliance, pressure tests before anything is covered up.

Waterproofing and tanking

Wet zones (shower cubicle floor and lower walls, floor around freestanding baths, wet room floors) get a full bonded waterproof tanking system before tiling — not just a bit of paint-on. This is what stops water tracking behind the tiles into joists and ceilings.

Wet rooms and level-access showers

Level-access wet rooms need proper fall on the whole floor towards a linear or point drain, correct board substrates, and a fully tanked floor and lower walls. We spec, fall, tank and tile them so they still work and look tight in 10 years — not just on handover day.

Sanitaryware, brassware and controls

We fit whatever spec you want — from good-value ranges (Roper Rhodes, Tavistock) up to premium (Hansgrohe, Vado, Villeroy & Boch, Duravit). We can also supply and install thermostatic mixer valves with pre-set anti-scald settings, and pair them with a Vaillant or Megaflo cylinder for genuine mains-pressure showering.

Coordinating other trades

Electrics, plastering and (where needed) building work are coordinated through us — you don't have to chase separate trades. Any Part P electrical work is completed and certified by a qualified electrician working alongside us.

Frequently asked questions

How long does a full bathroom installation take?

A straightforward refit in the same footprint is typically 2 weeks. A full replan with pipework alterations, wet room floors or new sanitaryware locations is usually 3–4 weeks. Your quote gives an exact timeline before we start.

Can you design the bathroom for me?

Yes. We'll take measurements, discuss how you use the space, suggest layouts, and can supply sanitaryware, tiles and brassware at trade prices — or fit your own selections.

Do you handle the electrical work?

Yes, coordinated through us. Any Part P notifiable electrical work is completed and certified by a qualified electrician working alongside our install.

Can you install a wet room?

Yes — we fit level-access wet rooms with fully tanked floors, linear or point drains, and correctly falling substrates. We'll flag if your subfloor makes a true wet room difficult before quoting.

Will I be without a bathroom during the works?

For a full refit, yes — usually 2–4 weeks. On multi-bathroom homes we can sequence works so you always have one bathroom in use.

Do you take a deposit?

No deposit is required on most bathrooms. Stage payments can be discussed for larger projects — always in writing.

Do you cover my area?

Yes — we cover Watford, Northwood, Rickmansworth, Pinner, Bushey, Hatch End, Stanmore, Middlesex and Greater London. If you're nearby but not listed, please call.

Related services

Areas we cover

Based in Watford, serving Hertfordshire and Greater London.

Need something not listed? Get in touch.

Book a bathroom design & survey visit.

Free survey, itemised written quote, one team from strip-out to snagging — with a 12-month workmanship guarantee.

Gas Safe 212325 4.9★ · 156 Google reviews 12-month workmanship guarantee